Talk:The Specials
This is the talk page for discussing improvements to the The Specials article. This is not a forum for general discussion of the article's subject. |
Article policies
|
Find sources: Google (books · news · scholar · free images · WP refs) · FENS · JSTOR · TWL |
Archives: 1 |
This article must adhere to the biographies of living persons (BLP) policy, even if it is not a biography, because it contains material about living persons. Contentious material about living persons that is unsourced or poorly sourced must be removed immediately from the article and its talk page, especially if potentially libellous. If such material is repeatedly inserted, or if you have other concerns, please report the issue to this noticeboard.If you are a subject of this article, or acting on behalf of one, and you need help, please see this help page. |
This level-5 vital article is rated Start-class on Wikipedia's content assessment scale. It is of interest to multiple WikiProjects. | ||||||||||||||||||||||||||||||||||||||
|
Confusion on Original Members
[edit]Don't know the band. Reading the article, it says the names of people who created the band in 1977. A couple of lines later, it says that one of those same people (Hall) seemingly first joined a second time, in 1979. Later, in a section showing the years that each member participated, it shows that another aforementioned 1977 member (Golding) did not join until 1979. Hope someone "in the know" can clear up these differences in the article. Jmg38 (talk) 10:39, 15 July 2012 (UTC)
External links modified
[edit]Hello fellow Wikipedians,
I have just modified one external link on The Specials. Please take a moment to review my edit. If you have any questions, or need the bot to ignore the links, or the page altogether, please visit this simple FaQ for additional information. I made the following changes:
- Added
{{dead link}}
tag to http://mymusos.com/part-one-of-our-exclusive-chat-with-the-specials/4515 - Added archive https://web.archive.org/web/20110720091551/http://www.davehaslam.com/control.php?_command=%2FDISPLAY%2F170%2F50%2F%2F6000%2F36015 to http://www.davehaslam.com/control.php?_command=%2FDISPLAY%2F170%2F50%2F%2F6000%2F36015
When you have finished reviewing my changes, you may follow the instructions on the template below to fix any issues with the URLs.
This message was posted before February 2018. After February 2018, "External links modified" talk page sections are no longer generated or monitored by InternetArchiveBot. No special action is required regarding these talk page notices, other than regular verification using the archive tool instructions below. Editors have permission to delete these "External links modified" talk page sections if they want to de-clutter talk pages, but see the RfC before doing mass systematic removals. This message is updated dynamically through the template {{source check}}
(last update: 5 June 2024).
- If you have discovered URLs which were erroneously considered dead by the bot, you can report them with this tool.
- If you found an error with any archives or the URLs themselves, you can fix them with this tool.
Cheers.—InternetArchiveBot (Report bug) 17:06, 28 November 2017 (UTC)
Terry Hall abduction
[edit]Thanks to Wikipedia bureaucrats, anonymous editors can't do anything to the Terry Hall article and I can't even post on his article's talk page there.
I wished to add something about Terry admitting recently he'd been abducted and abused when he was twelve in France.* It's a terrible thing but obviously he wishes to go on record about it:
- Hall said he was abused by a group of men over the course of several days in the 1970s. Following the ordeal he sought medical help for anxiety and quickly became addicted to valium...
- “At 12 I got abducted by a paedophile ring in France and that was a real eye-opener. And I can laugh about it now but it sort of switched something in my head and it’s like I don’t have to do that and that’s when I started like not listening to anyone.”
https://uk.news.yahoo.com/specials-terry-hall-reveals-kidnapped-paedophile-ring-child-153125080.html
No, I don't wish to set up an account.
Timeline
[edit]I added Encore to the timeline, but I didn't know how to set the timeline end point to just be the present, so I put today's date.
If anyone knows how to change that, go ahead
DeputyBeagle (talk) 18:15, 7 February 2019 (UTC)
Is Saffiyah Khan a member?
[edit]She's described so here but theface.com is not listed on WP:RSP. She's mentioned on the band's official bio but not specifically described as a member of the band. However, she went on tour with them and is not specifically listed anywhere I can find as a featured guest or something so I think it could go either way. Anyway, I just added a short paragraph about her in the current events section. Might need some editing. Thanks. Kire1975 (talk) 07:12, 1 January 2021 (UTC)
Change of name
[edit]I don't think the full story re the origins of The Specials' name has been told. As is documented, as nauseum, at first, they were called The Automatics, after automatic rifles/guns. Then, as we know, another band with the same name objected, so they changed it to The Specials AKA The Automatics which, unsurprisingly, got shortened to The Specials AKA (also known as) because they didn't want to lose the small following they'd built up from gigging locally. This is before they got the break that changed their career trajectory, supporting The Clash on tour. But what everyone fails to point out or explain to curious young minds is where they came up with the name The Specials. It's from the term 'Saturday Night Special', American slang for a cheap knock-off gun, usually bought wrapped in a brown paper bag from some dodgy bloke in a big city side street. From automatics to specials, geddit? Mag Wildwood (talk) 14:01, 14 May 2022 (UTC)
- @MadgeWildwood Do you have a source for one of the band members stating that origin for the name The Specials? I would interested in adding it to the article. Thanks :)
- RudeTheHamster (talk) 11:38, 25 August 2022 (UTC)
- Biography articles of living people
- Start-Class vital articles
- Wikipedia level-5 vital articles
- Wikipedia vital articles in People
- Start-Class level-5 vital articles
- Wikipedia level-5 vital articles in People
- Start-Class vital articles in People
- Start-Class Reggae articles
- High-importance Reggae articles
- WikiProject Reggae articles
- Start-Class biography articles
- Start-Class biography (musicians) articles
- Low-importance biography (musicians) articles
- Musicians work group articles
- WikiProject Biography articles
- Start-Class Pop music articles
- Mid-importance Pop music articles
- Pop music articles